Tech Resources
-

A. Final Report 30%_Shawsheen.pdf
(2.1M)Shawsheen River Restoration: Interim Feasibility Report, October 2009 -

B. APPA_Shaw30%.zip
(51.9M)30% Conceptual design drawings which accompany the FS. Warning: this is a very large file which may take some time to download. The file is in PDF format and is compressed to speed downloading. -

C. APP B_Shaw photoshop.pdf
(651K)App. B to FS: Photosimulations of restoration alternatives, Oct. 09 -

D. APP C_30%_COM.pdf
(243K)App. C. to FS: Cost estimates for restoration alternatives: Oct. 2009 -

E. APP D_Weston Report.pdf
(86K)App. D to FS: Structural Engineering Report -

F. PAL-balmoral&marland-final-20aug10.pdf
(3.2M)Cultural Resources Assessment (Historic Resources Study) for Balmoral and Marland Place Dams, August 2010 -

G. shaw-SMP-final-4nov10.pdf
(31.7M)Advanced Sediment Management Report for Balmoral and Marland Place Dams, November 2010 -

H. shaw-H&H-final-8mar11.pdf
(161.5M)Advanced Flood Modeling Report for Balmoral and Marland Place Dams, March 2011 (another very large file which will take a while to download). -

I. shaw-mtg-ppt-9jun10.zip
(67.8M)Powerpoint Presentation from Public Meeting on Shawsheen River Restoration--9 June 2010 -

J. Shawsheen_ ENF_041612_FINAL as submitted_small.pdf
(10M)Environmental Notification Form submitted for compliance with Mass. Environmental Policy Act, April 2012 -

K. 70%_Shawsheen_Design Report_041113.pdf
(9.8M)Final 70% Design Report for removal of Balmoral and Marland Place Dams, April 2013 -

L. IFI_SHAWSHEEN_70%_041713.pdf
(6.7M)Final 70% Design Drawings for removal of Balmoral & Marland Place Dams, April 2013 -

M. PAL Scope HR Intensive Balmoral Dam_rev101212-3.pdf
(397K)Proposed Scope of Work for Balmoral Dam Historic Resources Intensive Survey, Nov. 2012 -

N. EII NICRA 2011.pdf
(144K)NOAA - Earth Island Institute Indirect Cost Agreement -

O. monitoringplan.pdf
(78K)Draft Monitoring Plan for Shawsheen River Dam Removals, NOAA Grant Proposal, 18 Feb 2013

