Stakeholder Resources
-

1. Final Report 30%_Shawsheen.pdf
(2.1M)Shawsheen River Restoration: Interim Feasibility Report, October 2009 -

2. APPA_Shaw30%.zip
(51.9M)30% Conceptual design drawings which accompany the FS. Warning: this is a very large file which may take some time to download. The file is in PDF format and is compressed to speed downloading. -

3. APP B_Shaw photoshop.pdf
(651K)App. B to FS: Photosimulations of restoration alternatives, Oct. 09 -

4. APP C_30%_COM.pdf
(243K)App. C. to FS: Cost estimates for restoration alternatives: Oct. 2009 -

5. APP D_Weston Report.pdf
(86K)App. D to FS: Structural Engineering Report -

6. PAL-balmoral&marland-final-20aug10.pdf
(3.2M)Cultural Resources Assessment (Historic Resources Study) for Balmoral and Marland Place Dams, August 2010 -

7. shaw-SMP-final-4nov10.pdf
(31.7M)Advanced Sediment Management Report for Balmoral and Marland Place Dams, November 2010 -

8. shaw-H&H-final-8mar11.pdf
(161.5M)Advanced Flood Modeling Report for Balmoral and Marland Place Dams, March 2011 (another very large file which will take a while to download). -

9. shaw-mtg-ppt-9jun10.zip
(67.8M)Powerpoint Presentation from Public Meeting on Shawsheen River Restoration--9 June 2010 -

shaw-TNC-NOAA-complete-2011.pdf
(37.6M)Application to TNC-NOAA 2011 Restoration Grants

